Uranium Energy Corp’s East Poison Spider (EPS) Project consists of over 2,640 acres in state leases and lode claims; a minimum of 1,200 additional acres have been staked during Spring 2008. Note: general project area is depicted in diagram, not the actual claim & lease block boundary. The project is southeast of Burnt Wagon, along the southwestern flank of the southeastern Wind River Basin. As at Burnt Wagon, the EPS project area is bounded on the south by the North Granite Mountain Fault system, an area that has mineralization potential. Drill records from UEC’s Jebsen database indicate uranium mineralization in channel sandstone bodies within the Eocene-age Wind River formation.